Rasel Water Tap Factory

Design Lab 12th Social Business Design Lab
Design Lab Project Category others
Project Type Nobin
Title Rasel Water Tap Factory
Alias rasel-water-tap-factory
Location
Presentation File View Presentation File
Project Status In Developing Stage
Investment Status
Legal Status
Contact Name:
Email:
Phone: Organization:
Designation:
Detail:
Total Investment 0
Investment Amount 0
Mou Signing On
Is Approved Yes

Brief

- Running a factory for producing water tap with an experience of twenty two years.
- Factory have existing ten auto machine.
- Existing ten auto machine have ten dice for production of water tap.
- Production category: Blue water tap, White border water tap, Sink water tap and Star water tap.
- Plastic are buying from Chakbazar.
- Water taps are selling through sells man and dealer.
- Per year production is 30,240 Dozens (3, 62,880 pieces) and there is a greater demand of water tap that what’s current production and need to produce more 22,680 Dozens (2, 72,160 pieces) per year.
- To reach production goal, four additional dice is needed.
- Water taps are selling throughout the year.
- Average profit per piece Tk=4.40 and average production cost per piece Tk=13.50.

Business Objectives

- Self employment for the promoter.
- Create employment opportunity for more 14 people.
- Reduce the import dependency on this sector.
- Saving expense of foreign currency.
- Supplying good quality plastic product to low income group.
- Supplying cheap plastic products instead of expansive iron water tap.
- Contribute in improving of socio-economic condition.

Social Problem Addressing

Employment Opportunity

Social Impact

Investment Cost Details

Break Even Point

Payback Period

0

Total Investment Cost

Project Status Text

Other Information